Gateway to Bruce Hwy upgrade: Temporary Traffic Management

Gateway to Bruce Upgrade (G2BU)

The Gateway to Bruce Highway Upgrade (G2BU) is one of Queensland’s most significant road infrastructure projects. It upgrades the interchange connecting the Gateway Motorway and Bruce Highway at Nudgee, north of Brisbane. The project was delivered under an Early Contractor Involvement (ECI) model. Acciona Construction Australia Pty Ltd and Bielby Holdings Pty Ltd delivered the […]

Cunningham Hwy Ipswich-Rosewood Road Intersection Upgrade

The Cunningham Highway and Ipswich–Rosewood Road intersection (CHIRRI) is a key connection for freight and the local community. It also provides access to the Royal Australian Air Force (RAAF) Base Amberley, Australia’s largest operational air base. This intersection upgrade project focused on long-term planning to improve safety for all users along this critical transport corridor. […]

Moggill Sub-Arterial Road, Centenary Motorway to Rafting Reserve 

Moggill Road is identified as a principal cycle route in the Southeast Queensland Principal Cycle Network Plan. This active transport planning study, commissioned by TMR, investigated improvements along the Moggill Road corridor between the Centenary Motorway and Rafting Ground Reserve. Project scope and active transport planning objectives Marvel Engineers was engaged to: examine and develop […]

BIM Implementation Project

Marvel Engineers engaged with key stakeholders to build a greater awareness of TMR’s BIM Implementation project, assess the impact of implementing a CDE and seek feedback to improve the draft functional requirements, impact statements and process maps before finalisation.   Selecting which stakeholders to engage with was our key challenge. Having delivered infrastructure solutions for […]

M1/M3/Gateway Merge Upgrade

James was the Design Manager during the detailed design phase for the M1/M3/Gateway Merge Upgrade Increasing traffic capacity and road user safety within the constrained transport corridor were key drivers for the project. As Design Manager, it was James’ responsibility to facilitate collaboration between the design team and the contractor to achieve an outcome that […]

M1 Upgrade North – Sports Drive to Gateway Motorway

James was the Design Manager during the preliminary and detailed design phase for the M1 Upgrade North – Sports Drive to Gateway Motorway. James led the design development to improve 2.6 km’s of the Pacific Motorway northbound carriageway between Sports Drive and the Gateway Motorway. A key feature of the design included an off road […]

M1 Upgrade South – Palm Beach to Tugun

As a member of the Senior Management Team for the project, James managed the preliminary and detailed design of the motorway upgrade between Palm Beach and Tugun for the Department of Transport and Main Roads. An existing noise barrier adjacent to the southbound carriageway between Nineteenth Avenue and Palm Beach Avenue conflicted with the proposed […]

Gateway Upgrade North (GUN)

James was the Senior Civil Engineer for the design of the upgrade works on the Gateway Motorway between Bicentennial Road and the Deagon Deviation. Together with increasing traffic capacity and road user safety by widening the existing Gateway Motorway from 4 to 6 lanes, encouraging active transport with new and upgraded pathways were key drivers […]

Utility Services Coordination

We know that utilities are often one of the most high-risk activities for any project budget and program. Our team has an extensive background modelling new and existing utilities, and coordinating utility designs to avoid clashes with other project elements. We also have established relationships with all utility providers in Queensland which means that we can commence consultation immediately and minimise program risks.