Gateway to Bruce Hwy upgrade: Temporary Traffic Management

The Gateway to Bruce Highway Upgrade (G2BU) is one of Queensland’s most significant road infrastructure projects. It upgrades the interchange connecting the Gateway Motorway and Bruce Highway at Nudgee, north of Brisbane. The project was delivered under an Early Contractor Involvement (ECI) model. Acciona Construction Australia Pty Ltd and Bielby Holdings Pty Ltd delivered the […]
How we use tech: 12d

12d is one of those tools that people tend to have a strong opinion about. Some pick it up quickly and see the value straight away. Others find it clunky and hard to work with. I’ve seen both sides of that over the years I’ve been working in the industry. At Marvel Engineers, we’ve built […]
Understanding road drainage

When the rain hits the road, effective road drainage keeps traffic moving safely, protects pavements and reduces impacts on surrounding communities. Often hidden from view, road drainage is one of the most complex elements of road infrastructure. Here, we break down the key components of road drainage — from general design considerations and aquaplaning to […]
Caboolture River Road upgrade

The Caboolture River Road (CRR) upgrade was delivered in collaboration with and on behalf of the City of Moreton Bay (CMB). The project plays a key role in improving traffic capacity, road safety and active transport connections in the growing Caboolture and Morayfield corridor. Key features of the Caboolture River Road upgrade included: Widening Caboolture […]
Engineering Explained: Temporary Traffic Management

Upgrading an existing road has its challenges. Managing the risks associated with providing the optimal level of safety for people working in or near traffic, combined with the need to provide a safe road environment for all road users are important factors. Here we will discuss effective Temporary Traffic Management (TTM). What is Temporary Traffic […]
BIM demystified: Making sense of the acronym

BIM. Building Information Modelling/Building Information Model/Building Information Management. All these terms are commonly used under the heading of BIM but which one is correct? Starting out in BIM was confusing to me and it didn’t become any clearer when I started talking to other people in the industry about – it seemed all these terms […]
Engineering explained: Park n Rides

Park ‘n’ rides are a vital part of South East Queensland’s (SEQ) public transport network. As our communities grow and travel behaviours evolve, the need for accessible, efficient, and well-integrated transport options becomes more important than ever. With the introduction of 50 cent fares and a strong pipeline of public transport projects, we’re seeing a […]
Engineering and drainage design options

Marvel Engineers carried out engineering investigations to address immediate drainage impacts on the Redcliffe Golf Course, n a joint venture with Earth & Sea Consulting. The goal was to develop practical drainage solutions that could be implemented immediately to: reduce the time the course is closed and improve playability of the course following storm events […]
Cunningham Hwy Ipswich-Rosewood Road Intersection Upgrade

The Cunningham Highway and Ipswich–Rosewood Road intersection (CHIRRI) is a key connection for freight and the local community. It also provides access to the Royal Australian Air Force (RAAF) Base Amberley, Australia’s largest operational air base. This intersection upgrade project focused on long-term planning to improve safety for all users along this critical transport corridor. […]
Pedestrian Access and Mobility Plans (PAMP)

Marvel Engineers was engaged to develop three PAMP reports for each of the three towns within the Murrumbidgee Council area. The aim of the PAMPs was to improve the pedestrian network’s coherence, comfort, safety, and accessibility and mobility. The PAMPs guided Murrumbidgee Council in achieving its objectives to: facilitate improvements in the level of pedestrian […]